Home > Products > High Head Micro Turgo > XJ12kW-28M

Micro Turgo type double nozzle Hydro Turbine 12KW

Model No:XJ30-12DCTF4-Z
Output/Power:12kw
Rated Head:28 – 35 Meters
Rated Flow:50 – 60 (l/s)

XJ30-12SCTF4 is a AC direct systems consist of a turbine-generator unit producing AC power which is used as needed.  That is, it is fed directly to the appliances. No need of battery and inverter, XJ30-12SCTF4/ offers a complete water to wire system with integral Turgo turbine, generator and valve flow control. Designed to deliver ready-to-use 230V AC single phase power, it employs a brushless, special rare-earth permanent magnet  alternator and therefore has a higher efficiency than ordinary alternator.  Output voltage and frequency are controlled by the electronic load controller(with ballast). As little as 50 to 60 liter per second (l/s) falling 35 meter through a pipe, it can supply enough power to comfortably run a household. This machine is compact, easy to install and requires little maintenance except lubricating the bearing every few months.

The Turgo turbine was designed for families in remote areas to produce power for their households easily and inexpensively. These units have been incredibly successful and today thousands are installed throughout the world. These turbines need very little water flow to run efficiently and produce significant power out. The standard configuration uses two nozzles. Water is collected upstream from the turbine and channeled in a pipe down to the turbine location. At the turbine, the water passes through a nozzle, where it accelerates, strike the turbine runner, and turn a AC three-phase brushless permanent magnet alternator. A electric load controller is built on the alternator which stabilizes the voltage to 380V to protect electrical appliances during use. Installation is very simple and explained in the manual. Once installed there are no running costs and the maintenance costs are very low.

If you feel you may have a suitable site, please email specific information on your actual site. The information that is required for a preliminary assessment is:
1. The volume of water flowing in your stream, expressed as liters per second.
2. The head (height of drop) of the falling water, expressed in meters.
3. The length of the penstock (pipeline) in meters.